Paket Penyedia

  • Detil Paket

Nawacita
Janji Presiden
Prioritas Nasional
Program Prioritas
Kegiatan Prioritas
Proyek Prioritas
Output Program
Tematik
Kode RUP 65369452
Nama Paket Penyusunan Materi Teknis dan Ranperkada RDTR di Kabupaten Takalar
Nama KLPD Kementerian Agraria dan Tata Ruang/BPN
Satuan Kerja Direktorat Jenderal Tata Ruang
Tahun Anggaran 2026
Lokasi Pekerjaan
No. Provinsi Kabupaten/Kota Detail Lokasi
1. DKI Jakarta Jakarta Selatan (Kota) Jl. Raden Patah I No.1, Selong, Kebayoran Baru, Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12110
Volume Pekerjaan 2
Uraian Pekerjaan The six (6) main tasks in the formulation of RDTR are interrelated and sequential, as the outputs of each stage or task serve as inputs for the subsequent one. Therefore, the Consultant is required to have a thorough understanding of the workflow in accordance with applicable laws and regulations, as well as technical guidelines related to the preparation of technical materials, Draft Regional Head Regulation (Ranperkada) for the RDTR, and the associated SEA/KLHS. The required steps in the RDTR preparation process are set out in Figure 1 and listed below: Task 1: Preparation Task 2: Data and Information Collection Task 3: Data Processing and Analysis Task 4: Formulation of Concept Plan Task 5: Drafting the Regional Head Regulation of the RDTR for the Regency/City Task 6: Preparation of Requirements for Substantive Approval
Spesifikasi Pekerjaan To achieve spatial planning objectives and targets, the Consultant is to carry out the preparation of RDTR technical materials and the Draft Regional Head Regulation (Ranperkada) through six (6) main tasks in accordance with the Ministerial Regulation of ATR/BPN of 11 of 2021 on Procedures for the Preparation, Review, Revision, and Issuance of Substantive Approval of the Provincial, Regency/City Spatial Planning and Detailed Spatial Planning (RDTR). In addition, each task considers hazard and climate change exposure and vulnerabilities, as well as measures to build resilience over the timeframe of the Plan (i.e., 20 years). The implementation of this activity should follow the project's Environmental and Social Management Framework (ESMF), which can be accessed at the following link: https://projects.worldbank.org/en/projects-operations/document-detail/P180860?type=projects The six (6) main tasks in the formulation of RDTR are interrelated and sequential, as the outputs of each stage or task serve as inputs for the subsequent one. Therefore, the Consultant is required to have a thorough understanding of the workflow in accordance with applicable laws and regulations, as well as technical guidelines related to the preparation of technical materials, Draft Regional Head Regulation (Ranperkada) for the RDTR, and the associated SEA/KLHS. The required steps in the RDTR preparation process are set out in Figure 1 and listed below: Task 1: Preparation Task 2: Data and Information Collection Task 3: Data Processing and Analysis Task 4: Formulation of Concept Plan Task 5: Drafting the Regional Head Regulation of the RDTR for the Regency/City Task 6: Preparation of Requirements for Substantive Approval
Produk Dalam Negeri Ya
Usaha Kecil/Koperasi Ya
Pengadaan Berkelanjutan atau Sustainable Public Procurement (SPP)
Aspek Ekonomi Tidak
Aspek Sosial Tidak
Aspek Lingkungan Tidak
Pra DIPA / DPA Ya
Nomer KUAPPAS
Sumber Dana
No. Sumber Dana T.A. KLPD MAK Pagu
1. APBN - PINJAMAN LUAR NEGERI (B) 2026 Kementerian Agraria dan Tata Ruang/BPN IC.6668.PBT.078.088.0A.522131 4101384000
Total Pagu 4101384000
Jenis Pengadaan
No. Jenis Pengadaan Pagu Jenis Pengadaan
1. Jasa Konsultansi 4101384000
Total Pagu 4101384000
Metode Pemilihan Seleksi
Pemanfaatan Barang/Jasa
Mulai Akhir
April 2026 Desember 2026
Jadwal Pelaksanaan Kontrak
Mulai Akhir
April 2026 Desember 2026
Jadwal Pemilihan Penyedia
Mulai Akhir
Januari 2026 April 2026
History Paket
Tanggal Umumkan Paket 10 Februari 2026 10:59